Jaken Medical Inc.
Leadwire Set, Welch Allyn/Hillrom, WAM/AM12 10-Leadwire with Pinch Clips, Long Leads, 9293-047-60
$235.00
/
Shipping calculated at checkout.
SKU:
LW-9293-047-60
Product Availability:
Lead-time for this product may be 2-3 weeks.
Request A Quote
Warranty Information
90-Day Warranty.
Files
Click here to find this products equipment manuals
Leadwire Set, Welch Allyn/Hillrom, WAM/AM12 10-Leadwire with Pinch Clips, Long Leads, 9293-047-60
- 10 wire AHA lead set with clips, long length, for use with WAM or AM12
- 34 inches to 47 inches, limb and chest leads
- 90-Day Warranty
- Any returns may be subject to a restocking fee.
